As a utility contractor responding to the repair of a water main break, utilizing the Manual on Uniform Traffic Control Devices (MUTCD), prepare a traffic control plan.

a) Plan with detailed signage and lane diversions.
b) Plan with minimal traffic disruption, focusing on fast repairs.
c) Plan emphasizing pedestrian safety over vehicular traffic.
d) Plan with no road closures, using flaggers for traffic control.