The beam to beam distance is 6m x 6m. Calculate for the beam and column design External loading (Roof)
Snow load = 0.6k(N)/(m²)
Services = 0.4k(N)/(m²)
Roof finishes = 0.4k(N)/(m²)
Concrete s

A) 0.6k(N)/(m²)
B) 0.4k(N)/(m²)
C) 0.3k(N)/(m²)
D) 0.5k(N)/(m²)