Your coworker has to develop a cost estimate but is unsure which is the best one based on a bell curve of costs for past projects. What is a general practice for choosing the best estimate?
a) Selecting the estimate with the highest cost
b) Selecting the estimate with the lowest cost
c) Selecting the estimate with the median cost
d) Selecting the estimate with the mode cost