If the cross-sectional area of an embankment at 30 m intervals are 20, 40, 60, 50, and 30 m² respectively then the volume of the embankment on the basis of the prismoidal rule is
1. 5300 m³
2. 8300 m³
3. 4300 m³
4. 6300 m³