xercise 2-3 (Static) Computing Total Job Costs and Unit Product Costs Using a Plantwide Predetermined Overhead Rate [LO2-3]
Mickley Company’s plantwide predetermined overhead rate is $14.00 per direct labor-hour and its direct labor wage rate is $17.00 per hour. The following information pertains to Job A-500:
Direct materials $ 231
Direct labor $ 153
Required:
1. What is the total manufacturing cost assigned to Job A-500?
2. If Job A-500 consists of 40 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)