The volume of liquid collected in a vat in particular factory is a normal random variable with a mean of 6.90 kL/day and a standard deviation of 1.20 kL/day.
a. If the vat is designed with a maximum capacity of 10 kL/day, what is the probability (as proportion, not percent) that it will overfill during a particularly productive day?