Krystal manages Ironman's a high volume machine shop that operates 8 hours per day 270 days por year. The daily demand for faucets is 2.800. Assume she runs two production des per day (one cycle for brass faucets and one for stoel faucets) resulting in a target lot quantity (Op) of 1,400 units per production run to produce each type of fact, the fine must be reconfigured and set-up between each production cydo. Ansume the company is capable of produong 5,000 faucets per day and holding cost per unit is $0.80 per year, What is the annual demand (D) for faucet units per year (Please round to the nearest whole number) What is the target set-up cost in dollars per setup? Sper set-up (Penso round to two decimal places) Assume the setup laborato $15 per hour, What is the target mot up time in minuten minuten (Please round to one decimal phaco)