Following are simplified job cost sheets for three custom jobs at the end of June for Custom Patios. Job Number 102 Materials $ 23,000 Labor Overhead 11,000 3,300 $ 71,000 Materials Labor 27,500 eBook Overhead 8,250 B Materials $ 46,000 Hint Labor 45,000 Overhead 13,500 Print All jobs were started in June. Overhead is applied with a predetermined rate based on direct labor cost. Jobs 102 and 103 were finished in June, and Job 104 will be finished in July. 1. What was the total cost of direct materials requisitioned in June? References 2. How much total direct labor cost was incurred in June? 3. How much total cost is transferred to Finished Goods Inventory in June?