Fifty units of P1 need to be completed in week 8 according to the master production schedule shown below. Explode the end product requirements into their corresponding number of subassemblies, components, and materials. Week Product line 2 6 7 8 9 M model liner 200 200 200 150 150 120 120 100 100 N model line 80 60 30 20 10 P model line 70 130 25 (a) Aggregate production plan Week Product line models 2 7 Model M3 120 120 100 100 80 70 Model M4 30 Model N8 20 Model Pl 50 Model P2 (b) Master production schedule Master P Product Subassembly $1 (1) C2 C3 Component C1 (1) (1) Material MI M2 M3 (1) (1) (1) 1 120 80 80 80 80 70 $2 30 25 (2) C4 C6 T₂) T₂2) (1) M4 M5 M6 (1) (1) (.5) 10 100 100 70 100