An activated sludge process facility with two aeration tanks (each 40 feet long and 40 feet wide) and four secondary clarifiers (each 90 feet in diameter) receives an average flow rate of 20 million gallons per day. What is the hydraulic loading rate for the secondary clarifiers in gallons per day per square foot