Leaky bucket Assume the bucket in Example 4 is leaking. It starts with 5 liters of water (5kg) and leaks at a constant rate. It finishes draining just as it reaches the top. How much work was spent lifting the water alone? (Hint: Do not include the rope and bucket, and find the proportion of water left at elevation x m.)