A contractor bought 8.2 ft² of sheet metal. He has used 2.3 ft² so far and has ​118$ worth of sheet metal remaining. The equation 8.2x-2.3x represents how much sheet metal is remaining and the cost of the remaining amount. How much does sheet metal cost per square​ foot?