identify each of the preceding costs as either a product or a period cost. if the cost is a product cost, decide whether it is for direct materials (dm), direct labor (dl), or manufacturing overhead (moh) and also identify each of the preceding costs as variable or fixed cost. assumes that screws, sandpaper, and paint are not worth the effort to trace to specific units.